TotalEnergies E&P UK Upstream Operational Information

As required under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT), this page provides information on the planned maintenance and unplanned unavailability of infrastructure operated by TotalEnergies E&P UK Limited.

Whilst every effort is made to ensure that the information is given in good faith and to the best of our knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of that information.

Notification of Planned Unavailability

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

NSMP - SF228/07/2025  21:15:0728/07/20251 Days0.2Export from Laggan Tormore commenced.
NSMP - SF126/07/2025  08:04:4829/07/20253 Days1.9Delay of 24 hours to Laggan Tormore export stopped for pigging works.
NSMP - SF025/07/2025  16:34:0328/07/20253 Days1.9Laggan Tormore export stopped for pigging works.
NSMP - SF428/07/2025  14:08:4928/07/20251 Day0All Alwyn gas going to National Grid from 1500.
NSMP - SF328/07/2025  05:29:0729/07/20251 Day0.9Reduced Alwyn delivery into National Grid due to delivery of gas offshore.
NSMP - SF227/07/2025  20:37:2728/07/20251 Day3.2Reduced Alwyn delivery into National Grid due to delivery of gas offshore.
NSMP - SF127/07/2025  13:51:3728/07/20251 Day2.65Reduced Alwyn delivery into National Grid due to delivery of gas offshore.
NSMP - SF027/07/2025  00:47:3628/07/20251 Day1Reduced Alwyn delivery into National Grid due to delivery of gas offshore.
NSMP - SF105/07/2025  13:08:1106/07/20251 Day0.2Laggan Tormore export ramping up from pigging works.
NSMP - SF004/07/2025  13:47:0606/07/20252 Days1.7Laggan Tormore export stopped for roughly 2 days for pigging works.
Teeside CATS027/05/2025  06:31:2728/05/20251 Day1.8Reduced production from Culzean.
NSMP - SF022/05/2025  11:23:5826/05/20254 Days2.0Planned maintenance.
Teeside CATS824/05/2025  21:24:1325/05/20251 Day0.0Production back to previous levels.
Teeside CATS724/05/2025  07:31:0425/05/20251 Day0.5Reduced production from Culzean.
Teeside CATS623/05/2025  07:43:2724/05/20251 Day0.5Reduced production from Culzean.
Teeside CATS521/05/2025  21:37:4223/05/20252 Days0.8Reduced production from Culzean.
Teeside CATS421/05/2025  06:43:1722/05/20251 Day2.3Reduced production from Culzean.
Teeside CATS320/05/2025  19:46:0322/05/20252 Days3.0Culzean ramp up ongoing to previous rates.
Teeside CATS220/05/2025  15:51:4422/05/20252 Days3.0Culzean restarted and will ramp up to previous rate by gas-day 21st May.
Teeside CATS120/05/2025  10:28:5522/05/20252 Days3.7Culzean has tripped. Restart unknown.
Teeside CATS020/05/2025  07:48:2322/05/20252 Days1.4Reduced production due to maintenance.
Bacton SEAL902/05/2025  09:01:0602/05/20251 Day0Production back to normal levels.
Bacton SEAL801/05/2025  18:39:1602/05/20251 Day2.9Flows from Bacton SEAL will commence from 20:00hrs with a ramp up to full rates overnight.
Bacton SEAL701/05/2025  16:23:2202/05/20251 Day4.9Elgin Franklin rig move complete and production has restarted. Flows from Bacton SEAL will commence later tonight with a ramp up to full rates.
Bacton SEAL630/04/2025  14:29:0201/05/20251 Day4.9Elgin Franklin rig move ongoing.
Bacton SEAL529/04/2025  11:34:4130/04/20251 Day4.9Elgin Franklin rig move ongoing.
Bacton SEAL427/04/2025  23:07:3329/04/20252 Days4.9Elgin Franklin rig move is forecast to commence 06:00hrs, timings may change.
Bacton SEAL327/04/2025  22:03:5729/04/20252 Days4.9Elgin Franklin rig move is forecast to commence 02:00hrs, timings may change.
Bacton SEAL227/04/2025  15:40:1029/04/20252 Days4.9Elgin Franklin rig move is further delayed.
Bacton SEAL127/04/2025  11:22:2429/04/20252 Days4.9Elgin Franklin rig move is delayed. Flows from Bacton SEAL will commence again from 12:00hrs onwards. Current estimate for rig move is that it will start after 15:00hrs.
Bacton SEAL027/04/2025  08:22:0729/04/20252 Days4.9Elgin Franklin production will cease due to a planned rig move. Flows from Bacton SEAL will stop at 09:00hrs. Approximately 2 MCM/D of Elgin Franklin gas is being delivered at the Bacton Perenco terminal, this will also stop.
NSMP - SF319/04/2025  13:34:4920/04/20251 Day1.8Reduced production from Alwyn.
NSMP - SF219/04/2025  07:47:1520/04/20251 Day1Reduced production from Alwyn.
NSMP - SF118/04/2025  08:12:0719/04/20251 Day2Reduced production from Alwyn.
NSMP - SF018/04/2025  07:50:3419/04/20251 Day1.5Reduced production from Alwyn.
NSMP - SF119/03/2025  22:48:0121/03/20252 Days2.4Reduced delivery at NSMP St Fergus.
NSMP - SF018/03/2025  21:08:2420/03/20251 Day3.9Reduced delivery at NSMP St Fergus.
Bacton SEAL629/08/2025  11:29:5729/08/20251 Day5Elgin Franklin delivery at SEAL terminal is due to start from midday at approx 3.7 MCM/D.
Bacton SEAL528/08/2025  14:36:1729/08/20251 Day5Elgin Franklin gas export is forecast to start tonight, depending on ramp up there is a possibility that gas will be delivered at the SEAL terminal later this gas day.
Bacton SEAL426/08/2025  18:40:5328/08/20252 Days5Elgin Franklin restart process is underway. Ramp up to normal rates will take approximately 2 days.
Bacton SEAL325/08/2025  11:18:2227/08/20252 Days5Elgin Franklin export restart is expected on the evening of the 26th. Ramp up to normal rates will take approximately 2 days.
Bacton SEAL224/07/2025  13:58:0926/08/20252 Days5Elgin Franklin exports will ramp down on the 27th July with flows expected to stop to National Grid by the start of gas day 28th July. Approximately 1.9 MCM/D of Elgin Franklin gas going to the Perenco terminal will stop at the same time.
Bacton SEAL124/07/2025  13:40:4226/08/20252 Days5Elgin Franklin exports will ramp down on the 27th August with flows expected to stop to National Grid by the start of gas day 28-Aug-2025. Approximately 1.9 MCM/D of Elgin Franklin gas going to the Perenco terminal will stop at the same time.
Bacton SEAL011/03/2025  13:45:5826/08/202525 Days5Due to planned maintenance at the Bacton Terminal. Elgin Franklin exports will stop. Approximately 2.0 MCM/D of Elgin Franklin gas going to the Perenco terminal will stop at the same time.
Bacton SEAL011/03/2025  13:35:5726/08/202525 Days5Gas export route unavailable due to planned onshore maintenance at third party terminal.
NSMP - SF506/02/2025  20:37:1608/02/20252 Days2.1Approximate reduced delivery at NSMP St Fergus. Rates may fluctuate.
NSMP - SF405/02/2025  21:39:5907/02/20252 Days1.7Approximate reduced delivery at NSMP St Fergus. Rates may fluctuate.
NSMP - SF305/02/2025  14:14:2606/02/20251 Day1.7Approximate reduced delivery at NSMP St Fergus. Small increase in delivery from 1500.
NSMP - SF205/02/2025  07:32:0506/02/20251 Day2.2Approximate reduced delivery at NSMP St Fergus.
NSMP - SF105/02/2025  07:25:2806/02/20251 Day2.7Approximate reduced delivery at NSMP St Fergus.
NSMP - SF004/02/2025  22:55:1406/02/20252 Days2.4Approximate reduced delivery at NSMP St Fergus.
       

Notification of Unplanned Unavailability

ASEP

Revision

Date Published

Event Date

Expected Duration

Loss of
Volume 
(mcm/d)

Comments

NSMP - SF816/08/2025  17:40:5417/08/20251 Day1.4Alwyn ramp up is still ongoing. Normal production expected by gas-day 17th August.
NSMP - SF716/08/2025  07:15:5117/08/20251 Day1.9Alwyn ramp up is still ongoing.
NSMP - SF615/08/2025  21:24:0817/08/20252 Days2.4Alwyn ramp up is still ongoing.
NSMP - SF515/08/2025  13:57:3716/08/20251 Day2.4Alwyn has restarted and ramp up is ongoing.
NSMP - SF415/08/2025  11:04:0716/08/20251 Day2.9Alwyn has restarted and ramp up is ongoing.
NSMP - SF314/08/2025  13:53:0916/08/20252 Days3.4Alwyn has tripped and restart is currently unknown.
NSMP - SF213/08/2025  22:18:5715/08/20252 Days3.4Alwyn has tripped and restart is currently unknown.
NSMP - SF112/08/2025  22:18:5714/08/20252 Days3.4Alwyn has tripped and restart is currently unknown.
NSMP - SF011/08/2025  21:24:4513/08/20252 Days3.4Alwyn has tripped and restart is currently unknown.
Teeside CATS413/08/2025  10:51:1214/08/20251 Day0.7Culzean back to normal production levels.
Teeside CATS313/08/2025  06:54:3914/08/20251 Day1.3Culzean restarted, ramp up ongoing.
Teeside CATS212/08/2025  22:21:0514/08/20252 Days4.4Culzean restarted, ramp up ongoing.
Teeside CATS112/08/2025  11:02:0013/08/20251 Day4.4Culzean trip, restart planned for this afternoon.
Teeside CATS012/08/2025  08:58:4213/08/20251 Day2.1Culzean trip.
NSMP - SF022/07/2025  09:48:4222/07/20251 Day1.2Elgin-Franklin tripped but restart ongoing. Reduced flows from Bacton SEAL with full rates expected by 16:00hrs today.
NSMP - SF610/07/2025  16:46:0511/07/20251 Day1.2Laggan Tormore continues to ramp up, normal rates expected tomorrow.
NSMP - SF510/07/2025  06:14:0010/07/20251 Day1.2Laggan Tormore has restarted.
NSMP - SF409/07/2025  16:28:1510/07/20251 Day2.7Current plan is to restart production during gas day 10-Jui-2025.
NSMP - SF309/07/2025  05:55:4910/07/20251 Day2.7Laggan Tormore trip.
NSMP - SF208/07/2025  15:40:4709/07/20251 Day2.5Laggan Tormore trip.
NSMP - SF108/07/2025  10:22:5909/07/20251 Day2.4Laggan Tormore trip.
NSMP - SF008/07/2025  05:34:4709/07/20251 Day2.0Laggan Tormore trip.
Bacton SEAL305/07/2025  13:28:1106/07/20251 Day0.0All Alwyn gas now going to NSMP terminal.
Bacton SEAL205/07/2025  13:05:1506/07/20251 Day0.7Alwyn production remains unaffected but gas being delivered to National Grid has been reduced.
Bacton SEAL105/07/2025  04:46:1406/07/20251 Day1.5Alwyn production remains unaffected but gas being delivered to National Grid has been reduced.
Bacton SEAL004/07/2025  13:43:4705/07/20251 Day2.9Alwyn production remains unaffected but gas being delivered to National Grid has been reduced.
Bacton SEAL130/06/2025  05:24:2130/06/20251 Day4.4Elgin Franklin has restarted, flows to from Bacon SEAL forecast to re-start from 0800.
Bacton SEAL029/06/2025  08:17:1330/06/20251 Day4.4Elgin Franklin trip, Flows at Bacton SEAL will stop at 0900hrs. Approximately 1.6 MCM/D of Elgin Franklin gas is being delivered at the Bacton Perenco terminal, this will also stop. Cause of trip unknown at present, restart unknown.
NSMP - SF314/06/2025  20:16:2815/06/20251 Day0.9Alwyn rates increasing. Normal rates expected tomorrow.
NSMP - SF214/06/2025  17:36:4815/06/20251 Day1.2Alwyn rates increasing. Normal rates expected tomorrow.
NSMP - SF114/06/2025  15:56:5615/06/20251 Day2.0Alwyn rates increasing. Normal rates expected tomorrow.
NSMP - SF014/06/2025  07:28:1815/06/20251 Day3.1Alwyn tripped overnight. Restart ongoing.
NSMP - SF304/06/2025  05:54:3105/06/20251 Day1.2Alwyn has restarted, ramping up to normal rates.
NSMP - SF203/06/2025  06:43:0904/06/20251 Day2.2Alwyn has restarted, ramping up to normal rates.
NSMP - SF102/06/2025  14:22:4203/06/20251 Day2.0Alwyn has tripped. Restart is unknown.
NSMP - SF002/06/2025  07:52:4203/06/20251 Day1.7Alwyn has tripped. Restart is unknown.
Teeside CATS319/05/2025  15:46:2120/05/20251 Day0.3Culzean ramp up complete.
Teeside CATS219/05/2025  10:27:1720/05/20251 Day7.4Culzean has restarted and ramp up is underway. Normal rates expected by gas-day 20th May.
Teeside CATS119/05/2025  07:47:3620/05/20251 Day7.4Culzean has tripped. Restart is unknown.
Teeside CATS019/05/2025  07:44:0220/05/20251 Day7.4Culzean has tripped. Restart is unknown.
Teeside CATS430/04/2025  23:00:5601/05/20251 Day1.6Culzean ramp up ongoing.
Teeside CATS330/04/2025  11:17:5701/05/20251 Day2.9Culzean ramp up ongoing.
Teeside CATS230/04/2025  08:48:1101/05/20251 Day5.3Culzean has restarted and will continue to ramp up over the gas-day.
Teeside CATS130/04/2025  06:32:2201/05/20251 Day8.5Culzean has restarted and will continue to ramp up over the gas-day.
Teeside CATS029/04/2025  19:30:0730/04/20251 Day9.3Culzean has tripped.
NSMP - SF1630/05/2025  07:07:0531/05/20251 Day0.6Alwyn back to normal production levels.
NSMP - SF1529/05/2025  11:18:2931/05/20252 Days1.9Alwyn ramp up ongoing.
NSMP - SF1427/05/2025  15:49:1929/05/20252 Days1.9Alwyn has restarted and ramp up ongoing.
NSMP - SF1327/05/2025  06:24:3029/05/20252 Days2.0Alwyn has restarted and ramp up ongoing.
NSMP - SF1226/05/2025  21:58:4929/05/20253 Days2.6Alwyn has restarted and ramp up ongoing.
NSMP - SF1122/05/2025  21:31:3129/05/20257 Days2.6The oil export route remains unavailable for Alwyn. We don't know when we will be able to restart.
NSMP - SF1020/05/2025  19:02:2823/05/20253 Days2.6The oil export route remains unavailable for Alwyn. We don't know when we will be able to restart.
NSMP - SF906/05/2025  11:16:0221/05/202515 Days2.6The oil export route remains unavailable for Alwyn. We don't know when we will be able to restart.
NSMP - SF804/05/2025  09:05:1507/05/20253 Days2.6It's hoped the oil export route will be available on the 5th May . Due to time take to restart the plant no gas export expected on the 5th. A slow ramp up and re-building of stock in the pipeline should be expected.
NSMP - SF727/04/2025  11:09:1205/05/20258 Days2.6Alwyn export has stopped. Restart is currently unknown.
NSMP - SF625/04/2025  11:09:1228/04/20253 Days2.6Alwyn export has stopped. Restart is currently unknown.
NSMP - SF524/04/2025  13:17:5426/04/20252 Days2.6Alwyn export has stopped. Restart is currently unknown.
NSMP - SF423/04/2025  16:55:4525/04/20252 Days2.6Alwyn export has stopped. Restart is currently unknown.
NSMP - SF322/04/2025  16:57:3124/04/20252 Days2.6Alwyn export has stopped. Restart is currently unknown.
NSMP - SF221/04/2025  11:20:2923/04/20252 Days2.6Alwyn export has stopped. Restart is currently unknown.
NSMP - SF120/04/2025  11:04:0522/04/20252 Days2.6Alwyn export has stopped. Restart is currently unknown.
NSMP - SF020/04/2025  05:29:1621/04/20251 Day2.6Alwyn production has stopped.
NSMP - SF017/04/2025  07:36:3026/04/20259 Days1.8Laggan Tormore production forecast to stop later today, export forecast to restart around the 26th.
Bacton SEAL213/04/2025  09:56:5713/04/20251 Day2.4Elgin Franklin gas export has restarted, it's planned to restart delivery to National Grid from BACTON SEAL at 11am at minimum rates with flows ramping slowly up from then. Perenco flows ramping up from midday.
Bacton SEAL113/04/2025  06:00:3013/04/20251 Day4.9Elgin Franklin gas export stopped due to booster compressor trip, delivery from Bacton SEAL will stop at 0600. Elgin Franklin gas at Perenco will stop at 0600 also.
Bacton SEAL013/04/2025  04:44:4313/04/20251 Day2.4Elgin Franklin gas export stopped due to booster compressor trip, delivery from Bacton SEAL reduced to minimum. Elgin Franklin gas at Perenco reduced by approx 1.0 MCM/D.
Teeside CATS412/02/2025  13:39:1813/02/20251 Day4.6Culzean export ramping up to normal levels. Normal rates expected for tomorrow.
Teeside CATS312/02/2025  13:39:1813/02/20251 Day7.4Culzean platform tripped, expected to restart this afternoon.
Teeside CATS212/02/2025  11:42:5913/02/20251 Day6.0Culzean platform tripped, expected to restart this afternoon.
Teeside CATS112/02/2025  09:10:3513/02/20251 Day4.8Culzean platform tripped, expected to restart this afternoon.
Teeside CATS012/02/2025  05:51:5012/02/20251 Day2.6Culzean platform tripped, expected to restart in a couple of hours.
Bacton SEAL111/02/2025  22:01:2412/02/20251 Day1.9Elgin Franklin has restarted, Flows at SEAL to continue at minimum rates as Elgin Franklin ramps up.
Bacton SEAL011/02/2025  19:46:5312/02/20251 Day4.9Elgin Franklin export has tripped. Gas Flows at Bacton SEAL to stop from 2000. Approx 1.9 MCM/D of Elgin Franklin gas is being delivered at the Bacton Perenco terminal, this will stop from 2000 also.
Teeside CATS103/02/2025  22:26:5604/02/20251 Day3.9Culzean has restarted and is ramping up. Full rates are expected during gas-day 4th February.
Teeside CATS003/02/2025  12:20:5704/02/20251 Day3.9Culzean has tripped. Restart is forecast for later this gas-day.
NSMP - SF215/01/2025  18:51:5016/01/20251 Day0.9Laggan Tormore export has been restarted, it's not known yet when flows will restart at NSMP.
NSMP - SF113/01/2025  17:21:2621/01/20258 Days0.9Laggan Tormore export rates being ramped down to zero. Restart date estimated. After restart flows should be around 2.0 MCM/D.
NSMP - SF012/01/2025  23:30:0117/01/20255 Days0.9Laggan Tormore export rates being ramped down to zero. Restart date currently unknown.
NSMP - SF310/01/2025  19:59:5211/01/20251 Day1.4Alwyn has restarted and continues to ramp up, with rates expected to be close to normal for gas day 11th January.
NSMP - SF210/01/2025  16:33:5811/01/20251 Day3.0Alwyn has restarted and continues to ramp up, with rates expected to be close to normal for gas day 11th January.
NSMP - SF109/01/2025  13:55:0810/01/20251 Day3.0Alwyn restart process is under way but take some time to ramp up.
NSMP - SF008/01/2025  03:26:3109/01/20251 Day3.0Alwyn has tripped. Restart is currently unknown.
NSMP - SF405/01/2025  08:03:0405/01/20251 Day0.5Alwyn close to full production.
NSMP - SF304/01/2025  09:07:1205/01/20251 Day1.3Alwyn ramping up and expected to be at full rates by gas-day 5th January.
NSMP - SF203/01/2025  22:15:4404/01/20251 Day3.0Alwyn restart underway but ramp up is delayed.
NSMP - SF103/01/2025  13:31:4104/01/20251 Day3.0Alwyn export tripped, restart underway.
NSMP - SF003/01/2025  07:43:1604/01/20251 Day2.0Alwyn export tripped, restart underway.